Lambert Baggage Claim Drive Storm Sewer & Waterproofing

Market
Concrete Restoration
Cultural Institutions & Non-Profit
Size
Up to $5 Million
Square Footage
2,000
Noteworthy

Public safety, high-traffic area

Concrete

Tarlton upgraded the storm sewer along the lower-drive lane outside the Terminal 1 Baggage Claim area at Lambert-St. Louis International Airport. The project included full- and partial-depth concrete repair of elevated drive lanes, column and beam repair, waterproofing and the installation of drainage systems.


Related Project

Lambert Airport Main Terminal Garage Repairs