Let's Build Playlist

 
    Ameren Meramec Plant Coal System

Tarlton’s team built a new rail receiving and barge loading system to distribute coal via conveyors at the Meramec Plant, either for use at the plant or for resale.

The work required installation of a series of aerial conveyors between the terminal unloading facility and the Mississippi River, as well as control houses, transfer houses and all associated concrete work. Tarlton also installed underground conveyors and other equipment.

Tarlton Corporation | 5500 West Park Avenue  | St. Louis, Missouri  | 63110  |  main: 314-633-3300 fax: 314-647-1940

Share This Site: